Our remit on this clearance was to get the entire floor cleared ahead of a retrofit. Over 47 tonnes of office furniture was removed and disposed of (mostly reused and recycled). This was a particularly challenging clearance due to the location of the building. Everything had to come through just one lift, and then be brought through the underground carpark and up a ramp to street level. The job was particularly labour intensive and logistically challenging.
47+ Tonnes, mostly reused and some recycled
Working incident free in a live building
Huge quantity of furniture reused
Lift sheeted and padded and damage free